Transforming Dongdaemun Design Park + Plaza with BIM | The B1M | Summary and Q&A

41.9K views
June 1, 2016
by
The B1M
YouTube video player
Transforming Dongdaemun Design Park + Plaza with BIM | The B1M

TL;DR

Dong Damon Design Park and Plaza in Seoul, South Korea, is a public space and building project that successfully utilized BIM technology for spatial coordination and accurate fabrication data.

Install to Summarize YouTube Videos and Get Transcripts

Key Insights

  • 🔶 Dong Damon Design Park and Plaza in South Korea utilized BIM technology to overcome a range of challenges associated with complex design and large project teams.
  • ❓ BIM facilitated spatial coordination, accurate fabrication data, and efficient communication and decision-making.
  • 😤 The project team developed a new hybrid sheet metal processing technology called multipoint stretch forming for the unique aluminum panels.
  • 🖐️ BIM played a significant role in resolving issues and mitigating rework in complex construction projects.
  • 🍧 The project highlights the benefits of having a venue for sharing, discussing, and resolving urgent issues using BIM technology.
  • 🇰🇷 Dong Damon Design Park and Plaza is one of the early projects in South Korea to adopt BIM, marking the country's BIM journey.
  • 🦾 BIM technology enabled coordination with complex underground utilities and mechanical, electrical, and plumbing systems.

Transcript

dong Damon Design park and Plaza is a public space and building project on the site of a former stadium in Soul in South Korea the site area is steeped in history dong danam means great East Gate and was one of four Gates into Soul during the chosun dynasty more recently the area has become a hub for fashion media and new technologies designed by s... Read More

Questions & Answers

Q: What is the Dong Damon Design Park and Plaza project?

Dong Damon Design Park and Plaza is a public space and building project located in Seoul, South Korea. It consists of an 865,745,997-square-foot building and a landscape park. The building houses art exhibitions, conferences, a design museum, design labs, and a media center.

Q: How did the project team overcome the challenges of the complex design and large project team?

The project team used BIM technology to address these challenges. BIM helped in spatial coordination, identifying clashes, and mitigating rework. It also facilitated communication and decision-making among team members, despite working from different locations around the world.

Q: How did BIM technology contribute to the fabrication process of the unique building materials?

BIM technology played a significant role in providing accurate fabrication data. For the building's facade, a new hybrid sheet metal processing technology called multipoint stretch forming was developed. This technology allowed for mass customization of the 45,000 unique double-curved aluminum panels without using fixed molds.

Q: How did BIM technology enhance communication and decision-making on the project?

The project team faced communication and decision-making issues in the early stages, which led to the creation of an integrated design room called Common Ground. By using BIM models as a tool for communication, the team was able to resolve many problems more efficiently, saving time and resources.

Summary & Key Takeaways

  • Dong Damon Design Park and Plaza is a public space and building project in Seoul, South Korea, designed by sah de Architects.

  • The project faced challenges such as a complex design, large project team, and unique building materials.

  • BIM technology was used for spatial coordination, accurate fabrication data, and efficient communication and decision-making.

Share This Summary 📚

Summarize YouTube Videos and Get Video Transcripts with 1-Click

Download browser extensions on:

Explore More Summaries from The B1M 📚

Summarize YouTube Videos and Get Video Transcripts with 1-Click

Download browser extensions on: