The construction industry is constantly evolving, with new techniques and technologies being developed to ensure the stability and longevity of buildings. One such technique that has gained popularity in Germany is the use of piled raft foundations. Piled raft foundations provide a unique approach to distributing the load of a building, reducing settlement and ensuring the overall stability of the structure.

Ozan Bilal

Hatched by Ozan Bilal

Jun 10, 2024

4 min read

0

The construction industry is constantly evolving, with new techniques and technologies being developed to ensure the stability and longevity of buildings. One such technique that has gained popularity in Germany is the use of piled raft foundations. Piled raft foundations provide a unique approach to distributing the load of a building, reducing settlement and ensuring the overall stability of the structure.

In a recent project in Frankfurt, Germany, a piled raft foundation was used for the construction of the Forum building complex. The foundation consisted of 112 large-diameter bored piles and a secant bored-pile wall, which were connected to the raft. This design allowed for the settlement-reduced transmission of vertical loads from the superstructure via intermediate steel columns into the Frankfurt Clay.

During the top-down construction period, the piles were able to be used in an ideal manner for the settlement-reduced transmission of vertical loads. This means that the piles played a crucial role in transferring the load from the superstructure to the underlying soil, minimizing settlement and ensuring the stability of the building.

The results of the numerical design approach for the piled raft foundation of the Main Tower building demonstrated the remarkable activation of the secant-pile wall as an additional load-transferring part of the foundation. This highlights the effectiveness of the piled raft design in distributing the load and ensuring the stability of the structure in challenging geotechnical conditions.

The use of piled raft foundations in Germany is not limited to large-scale commercial buildings. This technique has also been successfully applied to residential buildings and infrastructure projects. The key advantage of piled raft foundations is their ability to distribute the load over a wider area, reducing settlement and increasing the overall stability of the structure.

One of the unique aspects of piled raft foundations is their adaptability to different soil conditions. Whether the soil is cohesive or non-cohesive, piled raft foundations can be designed to accommodate the specific characteristics of the site. This makes them a versatile option for construction projects in various geological settings.

While piled raft foundations offer numerous benefits, there are certain considerations that need to be taken into account during the design and construction process. One of the main challenges is the proper coordination between the piles and the raft. The connection between the piles and the raft should be carefully designed to ensure the effective transfer of loads and to prevent any potential failure modes.

In addition, the construction process of piled raft foundations requires expertise and precision. Bored piles and secant bored-pile walls need to be accurately installed to achieve the desired load-bearing capacity and overall stability. Proper quality control measures should be implemented to ensure the integrity of the foundation throughout the construction process.

To summarize, piled raft foundations have emerged as a popular choice in Germany for their ability to distribute loads, reduce settlement, and ensure the stability of structures. The use of large-diameter bored piles and secant bored-pile walls in conjunction with the raft allows for an effective load transfer system. However, proper design and construction practices are essential to maximize the potential of piled raft foundations.

Here are three actionable pieces of advice for those considering the use of piled raft foundations:

  • 1. Engage an experienced geotechnical engineer: Due to the complexity of piled raft foundations, it is crucial to involve an experienced geotechnical engineer from the early stages of the project. They can assess the site conditions, design the foundation system, and ensure that the construction process is carried out correctly.
  • 2. Implement rigorous quality control measures: To ensure the integrity of the piled raft foundation, it is important to implement rigorous quality control measures during the construction process. Regular inspections, material testing, and monitoring of the foundation performance can help identify any potential issues and address them promptly.
  • 3. Consider the long-term performance: When designing a piled raft foundation, it is important to consider the long-term performance of the structure. Factors such as differential settlement, soil consolidation, and potential ground movements should be taken into account to ensure the stability and durability of the foundation over time.

In conclusion, piled raft foundations have become a popular choice in Germany for their ability to distribute loads, reduce settlement, and ensure the stability of structures. The use of large-diameter bored piles and secant bored-pile walls provides an effective load transfer system, allowing for the construction of buildings in challenging geotechnical conditions. By engaging experienced professionals, implementing quality control measures, and considering long-term performance, the potential of piled raft foundations can be maximized, ensuring the stability and longevity of structures.

Hatch New Ideas with Glasp AI 🐣

Glasp AI allows you to hatch new ideas based on your curated content. Let's curate and create with Glasp AI :)